Pacific Northwest Geodetic Array
Central Washington University

Lake Chaplain

Lake Chaplain site is located about 9 km north of Sultan, Washington. The City of Everett provided permission to install a continously operating site at the City Water Filtration Plant at the Lake Chaplain Dam.

With help from SCIGN and UNAVCO, we installed a smaller, hand-drilled geodetic monument, known as the short drilled-braced geodetic monument. The monument design is perfect for rapid installations of continuous GPS sites. Data collection started on March 15, 2001.

It consists of 1-inch diameter stainless-steel rods forming a quad-pol that stands about 3 feet above the ground surface and is anchored 3 to 6 feet into bedrock. A generator- powered handhelp rotary drill using a 1.5-inch diameter drill bit is used to prepare the holes. Epoxy is used to anchor the stainless-steel rod in the holes.




Click Here for Data Timeseries Tool

Back